This page showcases schemes at various stages, from early planning to active delivery, reflecting our longstanding commitment to unlocking value through regeneration, refurbishment, and community-focused development.
From early-stage planning and active construction, to live sites already transforming communities, each project reflects our commitment to creating high-quality homes.
£8.5M investment | 103 refurbished homes
A wide collection of over 100 extensively refurbished homes, released in phases to the rental market over the next two years. Linton on Ouse is extremely well connected to York, Leeds and Harrogate, and benefits from being in the catchment area for highly regarded schools in the area.
Vision: Thoughtfully updated family homes that blend space, community and connection and split across five distinctive developments, each with its own identity.
First release: A selection 3 & 4 bedroom homes located on Maple Grove and White Rose Close launching mid-September. The homes will feature contemporary new kitchens with selected appliances included, as well as new bathroom suites, Karndean flooring, combi-boilers, and improved insulation. Some homes have double garages and all have parking.
Find out more
£2.9M investment | 11 refurbished homes
An exclusive collection of traditionally built 4-bedroom detached homes, ideally positioned in the sought-after village of Halstead, just minutes from Sevenoaks and the M25.
Vision: The properties will be transformed into high-quality homes that meet modern standards. Originally built with an LPG gas tank system, the heating has now been upgraded with air source heat pumps improving the energy efficiency, raising the EPC rating from E to C. Alongside new windows and doors, each home has been completely refurbished, with reconfigured open-plan kitchen/dining spaces, separate living rooms, en-suites to principal bedrooms, and large private gardens.
First release: The first four properties on Crow Drive will be available to let from October.
Find out more
£40M investment | 200+ refurbished homes
A significant regeneration project set in the heart of the new Mindenhurst neighbourhood, which will bring over 200 extensively refurbished 2, 3 & 4 bedroom homes to the rental market over the next three years.
Vision: Breathing new life into the former Princess Royal Barracks, this transformative regeneration will deliver much needed high-quality rental homes to the area.
First release: 20 three-bedroom homes launching this autumn on Malta Road. All will have new windows, doors and flooring throughout, along with brand new kitchens and bathrooms, generously sized bedrooms and private gardens. Each home also has allocated parking.
Find out more
£1.8M investment | Infill | 7 new homes
A collection of seven 3 bedroom terraced homes to be built on a parcel of land identified as a development potential within a previous release.
LAUNCHING 2026
£1.6M investment | Infill | 4 new homes
A collection of two semi-detached three bedroom homes to be built on a parcel of land identified as a development potential within a previous release.
This project will mark the return of Annington to the area after the full refurbishment of 53 properties in 2022/23 which were released to the open market for sale.
LAUNCHING 2027
£1.8M investment | Infill | 9 new homes
We’re thrilled to confirm the submission of a reserved matters application for nine new homes in Abingdon, Oxfordshire.
The homes will be constructed on a site previously identified for development potential, where Annington carried out light refurbishment of 57 properties and released them to the open market for sale during 2022/23.
The scheme includes:
• A mix of traditional 1, 2 & 3 bedroom family homes
• Green spaces & amenity areas for resident enjoyment
• EV charging, heat pumps and PV panels for greener living
• The delivery of a biodiversity net gain on site
Our application helps to address local housing need and will support the Vale of the White Horse in meeting its housing requirements, while continuing to deliver meaningful long-term benefits for the community.
LAUNCHING 2027
£15.6M investment | 2 additional stories | 40 apartments
Planning secured through airspace development for additional two stories, increasing the number of units from 24 to 40 and providing much needed rental properties to the area.
The design phase is currently in progress, with plans to begin construction on-site in early 2026.
LAUNCHING 2027
The final development may differ from the CGI shown, as details will be subject to the formal planning permission and conditions.
£16.5M investment | 82 new homes
Outline planning submitted for 82 private and affordable homes to be built on land identified as a development potential within the surrounding area of a previous new-build release, broadening our presence within the area.
LAUNCHING 2028/29